Milestones

Key moments in BAS's journey from its founding to today

2018

Turkey's largest capacity coarse-grained magnetite enrichment plant (650tph feed) was established as EPC (Birikim).

2019

The world's first chromite ore magnetic enrichment plant was established as EPC (Birikim).

2020

The world's first 5-deck high magnetic field intensity permroll separator was produced.

The world's finest (+63-120 microns) Na-Feldspar dry magnetic enrichment plant was established as EPC.

2021

Turkey's first counter-current 3-stage wet magnetic drum separator was produced.

2022

Turkey's first multi-sensor optical sorter technology center was established.

Turkey's first 48-pole high-frequency eddy current separator suitable for 24/7 operating conditions was produced.

Turkey's largest capacity wet magnetic drum separator (d80 75 microns, 90tph solid feed) was produced.

Turkey's first coarse-grained limonite ore magnetic enrichment plant was established as EPC.

2023

Turkey's largest capacity eddy current separator (1,650mm effective belt width) was produced.

Turkey's first steel slag micronized enrichment plant was established as EPC.

Turkey's largest capacity dry magnetic drum separator (d80 8mm, 180tph feed) was produced.

Turkey's first coarse-grained hematite ore dry magnetic enrichment plant was established as EPC.

2024

Turkey's largest-sized (2400mmx2000mm) and highest magnetic field intensity (0.15 T at a distance of 600mm) electromagnetic overband metal separator was produced.

Turkey's first commercial RGB camera optical separator was produced.

Turkey's first commercial AI-supported optical separator with NIR and 4 RGB cameras was produced.

2025

Turkey's first oil tank-free electromagnetic separator produced.

Turkey's first rectifier-free electromagnetic separator produced.

2026

Turkiye's biggest metal detector is produced. 2800x1500mm detector area.