Milestones

BAS’s some milestones and completed firsts in the sector.

  1. 2018 in Turkiye biggest capacity lump magnetite beneficiation plant (650tph feed) as EPC (Birikim)
  2. 2019 in the world first chromite ore magnetic beneficiation plant as EPC (Birikim)
  3. 2020 in the world first 5 deck high intensity permroll separator production 
  4. 2020 in the world finest (+63-120micrones) dry NaFeldspar magnetic beneficiation plant as EPC
  5. 2021 in Turkiye first countercurrent 3 step wet magnetic drum separator production 
  6. 2022 Turkiye’s first multi sensored optical sorter technology center foundation
  7. 2022 in Turkiye first 7/24 working conditon 48 Pole high frequency eddy current separator production 
  8. 2022 in Turkiye biggest capacity wet magnetic drum separator (d80 75 micrones 90tph solid feed) production
  9. 2022 in Turkiye first lump limonite ore magnetic beneficiation plant as EPC
  10. 2023 in Turkiye biggest capacity Eddy current separator (1.650mm effective belt width) production
  11. 2023 in Turkiye first steel slag micronized beneficiation plant as EPC 
  12. 2023 in Turkiye biggest capacity dry magnetic drum separator (d80 8mm 180tph feed) production
  13. 2023 in Turkiye first dry lump hematite magnetic beneficiation plant as EPC
  14. 2024 in Turkiye biggest size (2400mmx2000mm) and highest magnetic intensity (0,15 T at 600mm distance) electromagnetic overband metal separator production
  15. 2024 in Turkiye first commercial rgb camera optical sorter production
  16. 2024 in Turkiye first commercial nir and rgb cameras combinated with AI provided optical sorter production
  17. 2025 in Turkiye first oil tank free electromagnetic separator production 
  18. 2025 in Turkiye first rectifier free electromagnetic separator production